AIA Document G743C™–2015 modifies AIA Document G743™—2015 for use by contractor's submitting an application for payment to the Design-Builder. Modifications to G743—2015 are shown as tracked changes revisions—that is, additional material is underlined; deleted material is crossed out.
When to use this document?
- Any size project
- Contractor lists the portions of the work and their scheduled values
- Attach to the G742C