AIA Document G743S™–2015 modifies AIA Document G743™—2015 for use by subcontractors submitting an application to a contractor on a Design-Build project. Modifications to G743—2015 are shown as tracked changes revisions—that is, additional material is underlined; deleted material is crossed out.
When to use this document?
- Any size project
- Subcontractor lists the portions of the work and their scheduled values
- Attaches to the G742S